Reference
Project 
|
|
| |
 |
 |
 |
 |
| Page
: <<Back 1
| 2 |
3 |
| |
| |
|
| Client |
: |
Idreco
Asia Corporation |
| Location |
: |
Sripraya
Plant, Bangkok |
| Type |
: |
Multi
Stage |
| Year |
: |
1993 |
| Capacity |
: |
25,000
CMH |
| Product |
: |
Odour
Control System |
 |
|
 |
|
Project
Description
Multi stage
scrubber is often used as air pollution
control part of anaerobic wastewater
treatment plant because of its low capital
cost and easy to operate and maintenance.
At Sipraya plant , total air capacity
exhausted to the system is 15,000 CMH.
In order to avoid discharge of drainage
scrubbing liquid with too high or too
low pH return to wastewater treatment
plant , the system designed to utilize
pH meter to adjust the pH.
The result
from an independent laboratory shows
that H2S emissions can be
reduced by 95% using this technology.
|
|
|
|
| |
 |
| Client
|
: |
TCI
Co.,Ltd. |
| Location |
: |
Samutsakorn |
| Type |
: |
Dust
Collector |
| Year |
: |
2001 |
| Capacity |
: |
30,600
CMH |
 |
Project
Description
ACE supplied Dust Collector
for serving ceramic process, which
caused dust pollution by the spray
dryer.
ACE's
Dust Collector has the automatic
overheat protection as well as
the controlling system by Mini
PLC. |
|
|
|
|
|
| |
| Client
|
: |
VON
NORDENSKIOLD |
| Location |
: |
Samutprakarn
wastewater Treatment |
| Product |
: |
GRP
Pipes and Fittings |
| Type |
: |
DIN
16868 for Aeration System |
| Year |
: |
2002 |
| Quantity |
: |
1,400
m. |
| Capacity |
: |
30,600
CMH |
 |
|
Project
Description
ACE
Technologies supply GRP main pipe
(dia. 400 mm.) for three basins
included installation work. GRP
pipes and fittings manufacturing
comforms to GERMAN standard. |
|
 |
|
|
|
| |
|
| Client |
: |
Samsung
Lotte (CEC Joint venture ) |
| Location |
: |
Yannawa
plant, Bangkok |
| Type |
: |
Multi
Stages |
| Year |
: |
1998 |
| Product |
: |
Odour
Control System |
 |
Project
Description
The
22,000 m3/ h of malodorous
air from domestic anaerobic waste
water treatment plant ( YANNAWA)
is exhausted into cross and parallel
flow packed bed scrubber via polypropylene
high static pressure fan (4000
Pa. ) The first chamber is acid
to treat NH3 gas and
the second is oxidizing chamber
to oxidize mercaptan and H2S.
|
|
|
The semi - automatic
system controlled by PLC was comprised with
tools such as pH meter ,ORP meter, conductivity
meter, level control switch,Ultrasonic level
control, solenoid valve and drain valve. The
effluent air samples were taken for analysis
by an independent laboratory and showed qualities
that exceeded BMA H2S consent requirement.
(<0.01 ppm.) |
|
| [
Top ] |
| Page
: <<Back 1
| 2 |
3 |
|
 |
 |
 |
 |
|
|
| Member of Environmental
Engineering Association of Thailand |
|
|
|
|
76/5 Moo 3, Theparak Rd., K.M.10, Bangplee-Yai, Bangplee, Samutprakarn 10540. Thailand
Tel : +66 0-2759-7540 (20 lines) Fax : +66 0-2385-5211,
0-2759-7542
E-mail : info@aceco-th.com
|
| ::
Copyright 2004 www.siamnova.com
All Rights Reserved. ::
|
|
|